The use of prefabricated structures is justified in construction of such facilities as hotels, hostels and dormitories. It allows reducing construction time and optimising construction costs: the main purpose of the developer of such buildings is to maximise profit by accelerated commissioning of a completed facility.

Using a year-round method of construction with factory modules allows erecting a building within a short period of time.
Thus, the experience of NOVIY DOM proves at the example of construction of a two-story hotel in Stupino Quadrat that a building with a total area over 400 m2 can be erected on a ready-made foundation within 1 week.

See an example of hostel construction by following the link.

Projects of hotels are presented below:

For more information, please call 8 (495) 739 92 88 or contact us via the feedback form